ADDITIONAL BENCH
STATE CONSUMER DISPUTES REDRESSAL COMMISSION,
PUNJAB, CHANDIGARH.
Consumer Complaint No.644 of 2019
Date of Institution : 29.08.2019
Date of Reserve : 10.12.2021
Date of Decision : 23.12.2021
M/s Himalayan Renewable Energy Private Limited, SCO No.20,
Time Tower City, Dhuri Sangrur Byepass Near Nankiana Chowk,
Sangrur through its authorized officer.
Email :chamandeepnattegmail.com.
.….Complainant
Versus
The New India Assurance Company Limited, through its Divisional
Manager, Divisional Office, College Road, Sangrur-148001.
Email:nia361300@newindia.co.in.
..…Opposite Party
Consumer Complaint under Section 17
of the Consumer Protection Act, 1986.
Quorum:-
Mr. Rajinder Kumar Goyal, Presiding Member
Mrs. Kiran Sibal, Member
Present:-
For the complainant : Ms. Dhivya Jairath, Advocate
For the opposite party
: Sh. J.P. Nahar, Advocate
KIRAN SIBAL, MEMBER:-
The complainant has filed this complaint under Section
17 of the Consumer Protection Act, 1986 (in short “the Act”),
against the opposite party (in short “OP”) seeking following
directions to OP:-
A. To indemnify Loss of Rs.60 lakhs along with interest @
12% p.a. from the date of loss till its realization.
Consumer Complaint No.644 of 2019
2
B. To pay a sum of Rs.1,00,000/- to the complainant for
inconvenience, harassment, discomfort, disappointment,
mental agony and deficiency in service.
C. To burdened with punitive damages of Rs.1,00,000/-
D. Exemplary costs of Rs.55,000/-be awarded to the
complainant and
E. Any other relief though not prayed for, as deemed fit
and proper by this Commission in the facts and
circumstances of the present case be also awarded to
the complainant.
2.
Brief facts, as set out in the complaint, are that the
complainant is a Private Limited Company Registered under the
Companies Act, 1956 in the year 2003 and is running under the
name and style “M/s Himalayan Renewable Energy Private
Limited”. The present complaint is being filed by the complainant
through its authorized officer Mr. Chamandeep Singh, Director.
The complainant company was allotted a site for a micro hydro
electric project 600 KW on the Bathinda branch canal at village
Tallewal, Tehsil Tappa, District Barnala on lease by Punjab Energy
Development Agency. The complainant company had started
construction at the site in the month of January, 2017 and had
constructed the structure of Power House Building. The
complainant company obtained “ Standard Fire and Special Peril
Policy” vide policy No.36130011170100000033 for the site of the
project, building and machinery from the OP for a sum insured of
Rs.5.6 Crore for the period of six month from 20.11.2017 to
19.05.2018 and paid Rs.21,603/- as premium amount, vide receipt
No.3613008110000003087 dated 20.11.2017. At the time of
issuance of the above said policy, no terms and conditions were
brought to the knowledge of the complainant. The work in the
diversion canal was started by the complainant company on
Consumer Complaint No.644 of 2019
3
05.04.2018 after applying for shut down of the canal. Flow in the
canal was reduced since 05th April, 2018 till in the night of 18-19
April, 2018. Side walls near intake were constructed, column of the
gates total 4 in number were partly constructed with pilling
completed and casing of the shaft upto height of 1 to 2 meter in
the different columns. RCC bed on the upstream and downstream
of the gates was completed. In the night of 18-19 April, 2018,
suddenly water started rising in the canal and there was heavy
discharge due to which the structures under construction were
submerged in the water and were damaged. Damage was caused
to the work being done in the canal bed. The complainant informed
the OP about the rise of water in the canal resulting in loss to the
property of the complainant. The OP depute