Important Points

The contractor has a duty of care towards adjacent property owners, especially during construction activities that may impact their property.

Subject

Civil - Negligence

Act Referred

Evidence Act 1950: S.101, S.90A

Headnote

This judgment deals with an appeal from a Sessions Court award of damages for property damage due to alleged negligence. The court found that D3, the contractor, owed a duty of care to the plaintiffs, regarding the proximity of their properties. The appeal raises pivotal questions related to duty and breach in negligence. The court affirmed the trial judge's findings, ruling that D3's actions caused foreseeable damage, establishing their liability. Accordingly, D3's appeal was dismissed.

Petitioner Advocates:Nur' Izzah Mohd Tahir ,Respondent Advocate: Sri Richgopinath,Nur Muhaimin Mohd,Husaimi,Teoh Hui Chyuan

Table of Content
1. application of negligence principles in property damage. (Para 1 , 2 , 3)
2. establishment of duty of care and breach thereof. (Para 6 , 9 , 11)
3. damages were caused by negligence from construction. (Para 7 , 10)
4. cracks and damages occurred due to improper construction. (Para 12)
5. the duty of care extends to construction practices near adjacent properties. (Para 13 , 15)

[1] This appeal arose out of a decision of a Sessions Court where the plaintiffs there had claimed for damages arising out of the damage caused to the plaintiffs' property due to the defendants' negligence in executing construction works on their own buildings adjacent to the plaintiff's building.

Parties

[2] The plaintiffs are siblings, a brother and a sister, and they had inherited lot 2 from their deceased father. On lot 2 stands a 2 storey shophouse for the last 70 years bearing address NO 2 Jalan Utara, Off Jalan Imbi, 55100, Kuala Lumpur.

[3] The plaintiffs operate a sundry shop business from the ground floor of their property. They have been doing that since 1956 with the family members residing in the said property as well. The first plaintiff, PW 4 Goh Aik Chin, now stays in Singapore but the second plaintiff, PW 3 Goh Aik Bee, stays with her children in the said property.

[4] The first and second defendants (D1 and D2) are sisters and they are the owners of the adjacent Lots 6 and 4 respectively along the same row of pre-war shop houses.

[5] The defendants owners wanted to have an additional floor added to their existing 2 floors in their shop house and so they engaged the services of a contractor in the third defendant ("D3"), Shabiru (1990) Sdn Bhd, to do the construction works.

Problem

[6] As works were done by D3 on the property of the defendants owners, cracks, subsidence and water seepage appeared in the plaintiffs' property. When that happened there were some communication between the plaintiffs and defendants owners on what to do and some payments were made by them to the plaintiffs.

[7] However as the plaintiffs' building deteriorated further because of the continuing construction works on the defendants owners' property, the plaintiffs decided to sue for the damage to their property arising out of what they said is negligence on the part of all the defendants.

[8] The particulars of negligence consisted inter alia in the defendants failing to do proper shoring and propping works during the demolition of the building on the defendants owners land, the use of micropiling that affected the common foundation of the plaintiffs' property and generally not complying with proper method of construction in ensuring cracks, settlement and water seepage does not occur to the plaintiffs' building and breaching DBKL's approval of only carrying out additional floor works and not demolishing and reconstructing a new building in its place.

Proceedings At Sessions Court

[9] After a full trial the Sessions Court judge found in favour of the plaintiffs and awarded damages of RM 604,055.40 together with interest at the rate of 5% per annum from date of the writ to realization against all the defendants jointly and severally.

[10] The sum was arrived based on a quotation provided by a contractor PW 2 and confirmed by the plaintiffs' expert witness PW 5 Ir Tang Chow Ang as being more on the lower side of the costs necessarily incurred to rectify the damage caused to the plaintiffs' property.

[11] The Session Court Judge had found that the defendants owed the plaintiffs a duty of care based on the neighbour principle first expounded in the seminal case of Donoghue v. Stevenson [1932] AC 562. She also found that the defendants had breached that duty and that the damage was foreseeable.

[12] The damage as found by the trial judge consisted of 3 main incidents in the following:

(a) First Incident occurred around 17 June 2014 where the construction carried out by D3 had caused damage, inter alia, punctured holes to the Party Wall on the upper floor bedroom and