COURT OF APPEAL PUTRAJAYA
KEPALA BATAS BIHUN SDN BHD – Appellant
Versus
TENAGA NASIONAL BERHAD – Respondent
[Civil Appeal No: P-02(NCVC)(W)-139-01-2014]



Important Points

The requirement for a conviction is unnecessary for a claim of revenue loss under s 38 of the Electricity Supply Act.

Subject

Electricity Law - Revenue Loss and Tampering

Act Referred

Headnote

The appeal concerns a claim under s 38 of the Electricity Supply Act 1990 for revenue loss from meter tampering. The court found tampering established through inspection and testimonies, with prima facie evidence presented. The appellant's arguments on proof of tampering and claim legitimacy were dismissed, affirming the lower court's decision. The final outcome was a dismissal of the appeal with costs awarded to the respondent.
Table of Content
1. claim for revenue loss due to meter tampering under electricity supply act. (Para 1 , 7 , 8)
2. appellant's burden to prove no tampering and challenge the back-billing. (Para 10 , 15 , 18)
3. judicial commissioner's findings supported by thorough evidence analysis. (Para 11 , 12 , 14 , 20 , 22 , 24)
4. legal requirement for conviction is not needed for revenue loss claims. (Para 16 , 19 , 23)
Rohana Yusuf JCA:

[1] This is an appeal against the decision of the High Court in Penang which allowed the claim by the respondent (TNB) against the appellant for the sum of RM428,327.24 with costs, for loss of revenue resulting from meter tampering. This claim was based on s 38 of the Electricity Supply Act 1990 (" ESA "), in particular s 38(3) which reads:

"(3) The licensee may require the consumer to pay him for the loss of revenue due to the offence committed under s 37(1), 37(3) and 37(14) and any expenses incurred by the licensee under this section including expenses incurred in respect of the reconnection of electricity supply."

[2] The appellant, Kepala Batas Bihun Sdn Bhd, is a private limited company operating a noodle processing business at No 1239, Jalan Lahar Kepar, 13200 Kepala Batas, Pulau Pinang. The appellant received supply of electricity from the respondent for the purpose of the appellant's business.

[3] Upon an inspection carried out by the respondent's officer (SP1) on the meter board (pepasangan meter) at the appellant's premises on 12 May 2011, it was discovered that the meter board did not record the correct usage of the electricity. The red phase in particular recorded a zero reading instead. This zero reading was seen on the meter board.

[4] A second team of officers was dispatched by the respondent to the premises to conduct a follow up inspection about a week later on 17 May 2011. This team was headed by SP2. SP2 similarly recorded a zero reading as shown on the Borang Pemeriksaan Meter LPC Voltan Rendah. The record prepared by SP2 is at p 149 Rekod Rayuan Bhgn C Jilid 1. SP2 found that the wiring for the arus pendua for the red phase (fasa merah) was not connected. As a result of the disconnection, SP2 said for this red phase, the main current on the meter board showed a zero reading. Accordingly this zero reading could be seen by the naked eye. The presence of both inspection teams on 12 May 2011 and 17 May 2011, respectively, was recorded on the appellant's visitors log.

[5] SP4 testified that a Remote Meter Reading ("RMR") installed in relation to the appellant's premises enabled the respondent to read the appellant's meter from the respondent's office and to issue the monthly electricity bill without the need for a meter reader to be present at the appellant's premises. SP4 testified and explained that if the red, blue and yellow Phase were disconnected, then there would be zero reading for these phases on the meter board and these zero readings would be shown by the Remote Meter Reading. The zero reading recorded for the red phase by the inspection team on 17 May 2011 at the appellant's premises would also be shown by the RMR.

[6] On this suspicion, the team investigated and found tampering. The tampering of the meter was discovered upon the breaking up of the concrete cement conducted in order to inspect the discrepancy in the red phase meter reading. The red, blue and the yellow phases were located between the current transformer (CT) to TNB's underground terminal. The metal conduit had the markings of being broken or being cut in respect of the red phase. The same broken markings were also found for the yellow and blue phases which, however, had been restored using black tape. The photographs of the above description of tampering were produced to evidence the explanation of tampering.

[7] Pursuant to s 38(3) of the ESA , the respondent made a claim for the loss of revenue. In claiming for back-billing charges, SP3 testified that the calculation as at 12 May 2011 was based on the daily average u

1
2
3
4
5
6
7
8
9
10
11