2007 MarsdenLR 2196
AZIAH ALI
HIGH COURT (KUALA LUMPUR)
Sunway Damansara Sdn Bhd - Appellant
Versus
Malaysia National Insurance Bhd - Respondents
CIVIL SUIT NO S2–22–1150 OF 2006
Decided On : 12/12/2007
R Sadacharam (David Lingam & Co) for the plaintiff.
CK Oon (CK Oon & Co) for the second defendant.
[1] The plaintiff is the developer of a project known as Cadangan Pembangunan 130 Units Townhouse at Section 14, Kota Damansara, Mukim Sungai Buloh, Daerah Petaling, Selangor Darul Ehsan (‘the development’). The second defendant is a firm of professional consultants and engineers carrying out consultation and design work for the construction industry. The parties entered into a written engagement agreement (‘agreement’) dated 13 June 2005 whereby the second defendant undertook for payment to design and supervise the construction of a retaining wall lining the development (see encl 9 exh ‘KC–2’). The plaintiff alleged that on 20 December 2004 a section of the retaining wall lining the development moved forward a distance of about 120mm thereby causing damage and losses to the plaintiff. On 26 October 2005, several concrete columns on the [*877] development deviated from their respective positions and tilted as a result of the retaining wall being unable to retain its position. This resulted in the plaintiff having to carry out rectification works and delay the completion of the development.
[2] The plaintiff made a claim against the first defendant as insurer under a Contractor’s All Risk Policy. The first defendant repudiated liability on the ground that the movement of the retaining wall together with the tilting of the concrete columns were attributed to the faulty design of the retaining wall. Therefore according to the first defendant the damages and losses suffered by the plaintiff were not covered under the policy.
[3] The plaintiff through their solicitors sent a notice to the second defendant that in the event the damage and losses caused by the retaining wall was as a result of faulty design, then the plaintiff holds the second defendant liable for the said damage and losses suffered. The second defendant refuted ‘any allegation that the movement of the retaining wall has been caused by faulty design on the part of the second defendant’.
[4] The plaintiff instituted legal proceedings against the first defendant for wrongfully breaching the terms of the policy and against the second defendant for:
breach of the express, alternatively implied terms and conditions of
the agreement in designing a Retaining Wall which contained serious and
substantial defects which prevented the Retaining Wall from being used
as the plaintiff had intended and which was inadequate for the purpose
of ensuring safety against sliding;
failing to exercise reasonable care and skill in designing a Retaining
Wall which contained serious and substantial defects which prevented
the Retaining Wall from being used as the plaintiff had intended and
which was inadequate for the purpose of ensuring safety against sliding.
[5] The present application concerns only the plaintiff and the second defendant who are parties to the agreement which incorporated an arbitration clause as per cl 29.01 which states as follows:
29 DISPUTES
29.01 Any matters or disputes shall in accordance with and subject to
the provisions of the Arbitration Act 1952 or any statutory
modification or re-enactment thereof for the time being in force be
referred to two (2) arbitrators (one to be appointed by each party to
the dispute or difference) who shall by instrument in writing appoint
an umpire immediately after they are themselves appointed. If either
party shall refuse or neglect to appoint an arbitrator for seven (7)
clear days after the other party having appointed his arbitrators has
served the party making default with notice to make the appointment the
party who has [*878] appointed the arbitrator shall be entitled
to appoint that arbitrator to act as sole umpire in the reference. Upon
every or any such reference the umpire shall have power to determine on
the disputes that are being referred to them and their d