HIGH COURT MALAYA KUALA LUMPUR
I-EXPO SDN BHD – Appellant
Versus
TNB ENGINEERING CORPORATION SDN BHD – Respondent
[Civil Suit No: S1-22-1196-2006]



ALASAN PENGHAKIMAN

OLEH YANG ARIF HAKIM DATO' KANG HWEE GEE

Enclosure 4 is an application for interlocutory injunction to allow the plaintiff to enter into the project site and remove the scrap metals pursuant to a contract entered into with the defendant.

Enclosure 8 is an application for stay of proceeding pending the referral of the dispute to arbitration under the contract made pursuant to Section 10 of the Arbitration Act 2005 and under the inherent power of the court.

Counsel for the defendant raised an objection. He contends that Enclosure 8 should be heard first on two grounds:-

1. Enclosure 8 is a challenge to the Civil Proceeding being instituted to resolve the dispute in the face of the arbitration clause in the contract signed between the parties. Enclosure 4 could not therefore be heard first.

2. If Enclosure 4 is heard first and an injunction is granted until the full trial of the action, a subsequent stay under Enclosure 8 will mean that there will be no full trial of the action leaving the injunction to be indefinite and perpetual.

Counsel for the plaintiff disagrees:-

1. Enclosure 4 is an urgent application and the High court is the only means to protect the interest of the plaintiff as if it is not granted there is no question of the status quo to be maintained pending arbitration. In any case under Section 11 of the Arbitration Act 2005 the High court is empowered to grant interim injunction or any interim matters before or during arbitral proceeding.

2. One of the reliefs sought in Enclosure 4 is to prevent the defendant from awarding the contract to any other parties by reason of the subsisting contract which has been revoked.

Reply by defendant's counsel:-

1. The words "before or during arbitral proceeding" in Section 11(1) of the Arbitration Act 2005 must necessarily mean that an application for an interim injunction must be made in contemplation of taking out arbitral proceeding and not instituting a suit in the court like the plaintiff has done.

court:-

The power to grant an interlocutory injunction encompasses all situations where the court is required to intervene to preserve status quo of a dispute in order that its decision later would not be rendered nugatory. It applies in all instances whether before or during arbitral proceeding. There is no reason why Enclosure 8 should be heard first.

Enclosure 4

Plaintiff's submission:-

1. The plaintiff and the defendant entered into a contract whereby the plaintiff was to decommission, dismantle a power station and obtain the scraps therefrom for itself. The contract is contained in the Letter of Award dated 3.2.2006 Exhibit "AMI-3" (pages 182-186) Enclosure 3.

2. Under Clause 3 of the Contract the plaintiff was required to pay the defendant a sum of RM14 million in 2 stages - RM12 million within 2 weeks of acceptance of the Letter of Award and RM2 million within 3 months of acceptance of the Letter of Award. Under Clause 3(d) plaintiff was required to give a performance bond of RM3 million. Under Clause 3(f) date of completion of decommissioning and removal of the scraps has to be completed by 31st March 2007.

3. The plaintiff had paid RM12 million being the first payment. After this payment the parties agreed to vary Clause 3(d) whereby the plaintiff was allowed to provide the performance bond after the plaintiff sells the scraps after having dismantled the power station. See correspondence - letter dated 23.3.2006 Exhibit "AMI-18" page 704 (plaintiff's supporting affidavit). This letter shows a waiver on the part of the defendant of the need to provide performance bond before being allowed to take site possession. By allowing the plaintiff to take site possession for the purpose of commencing works clearly shows that there is a waiver of the requirement on the Clause 3(d). The letter dated 23.3.2006 clearly states that the plaintiff has satisfactorily fulfilled all the stipulated condition.

4. The only ground which the defendant is relying on to terminate this contract

1