HIGH COURT MALAYA, KUANTAN
MELVINDERJIT SINGH WALIA v. GENERAL HEIGHTS SDN BHD & ANOR
[CIVIL SUIT NO.: CA-22NCvC-18-04/2025]
IN THE HIGH COURT OF KUANTAN
IN THE STATE PAHANG DARUL MAKMUR
[CIVIL SUIT NO.: CA-22NCvC-18-04/2025]
BETWEEN
MELVINDERJIT SINGH WALIA
(IC NO.: 840617-10-5331)
... PLAINTIFF
AND
1. GENERAL HEIGHTS SDN BHD
(COMPANY NO.: 1014223-W)
2. MOHD HADRY BIN MASRI ONN
(IC NO.: 820710-06-6025)
(Administrator of the Estate of
MASRI ONN BIN MOHD SOM
(IC NO.: 530901-01-6033), Deceased)
... DEFENDANTS
GROUNDS OF JUDGMENT
Introduction
[1] These grounds concern two applications filed to strike out the Plaintiff's Writ and Statement of Claim pursuant to Order 18 rule 19 of the Rules of Court 2012, namely:
(a) Enclosure 10, filed by the First Defendant ("D1"); and
(b) Enclosure 12, filed by the Second Defendant ("D2")
[2] Both applications were heard together and dismissed by this Court. At the time these grounds were initially prepared, only the First Defendant had lodged an appeal on 10.12.2025. Subsequently, the Second Defendant also lodged an appeal on 15.12.2025. As both applications raise substantially identical issues, are supported by materially similar submissions and were disposed of by a single decision of this Court, these grounds of judgment are issued to address and dispose of both appeals.
[3] I have read the entire cause papers, considered the affidavits and written submissions filed by all parties in respect of both applications and heard the oral submissions before arriving at my decision.
Brief Facts
[4] The Plaintiff entered into a Sale and Purchase Agreement with D1 on 25.9.2014 for a two-storey residential property at Mahkota Heights for the purchase price of RM760,000. The Agreement contained both express and implied terms requiring the property to be constructed in a good and workmanlike manner, using materials of merchantable quality and in compliance with approved plans and specifications.
[5] The Certificate of Completion and Compliance ("CCC") was issued on 21.10.2015. The Plaintiff took vacant possession on 22.10.2015 and commenced occupation of the property in mid-January 2016.
[6] From 2017 onwards, the Plaintiff discovered various defects, including wall cracks, roof leaks, ceiling collapses and other structural and water ingress issues. Complaints were made to DI; however, no satisfactory remedial action was taken. Consequently, the Plaintiff lodged a complaint with the Ministry of Housing and Local Government (KPKT) on 23.1.2020 and subsequently engaged AMR Consult, a professional engineering firm, in May 2021 to inspect the property.
[7] The report prepared by AMR Consult dated 28.3.2022 identified defects attributable to poor design, substandard workmanship and defective construction materials. The defects were classified as latent defects, requiring expert assessment to ascertain their nature and cause. The Plaintiff asserts that D1 and the late architect, Masri Onn (represented by D2), breached their contractual and statutory duties to ensure proper construction and certification of the property.
[8] The Plaintiff claims, inter alia, special damages amounting to RM147,240.05 for remedial works, RM4,300 for the expert report and general damages of RM 1,000,000 for breach of contract and inconvenience.
[9] The Defendants have not filed their statements of defence. Instead, D1 filed Enclosure 10 seeking to strike out the Plaintiff's Writ and Statement of Claim under Order 18 rule 19 of the Rules of Court 2012 on the basis that the claim is barred by limitation under the Limitation Act 1953, in particular section 6A(2). D2 filed a similar application vide Enclosure 12.
The Law
[10] The principles governing the exercise of the Court's power to strike out pleadings under Order 18 rule 19 of the Rules of Court 2012 are well settled. This power must be exercised sparingly and only in plain and obvious cases where the action is clearly unsustainable.
[11] The leading authority is Bandar Builder Sdn Bhd v. United Malayan Banking Corporation Bhd [1993] 4 CLJ 7; [1993] 3 MLJ 36, where the Supreme Court held that a pleading should not be struck out unles