KARIYAWASAM VS. CENTRAL ENVIRONMENT AUTHORITY AND OTHERS
2019 SLR 3 21
KARIYAWASAM
Vs.
CENTRAL ENVIRONMENT AUTHORITY AND OTHERS
SUPREME COURT
PRIYANTHA JAYAWARDENA,J.
PRASANNA JAYAWARDENA, J.
DEHIDENIYA, J.
SC/FR/141/2015
FEBRUARY 8, MARCH 7, OCTOBER 4, 2018
Fundamental rights-Article 12(1) of the Constitution-Public interest
litigation-Pollution of groundwater and soil by thermal power station- National
Environmental Act, No. 47 of 1980, Parts IV A, IV Band IV C - National
Environmental (Procedure for Approval of Projects) Regulations, No. 1 of
1993-National Environmental (Protection and Quality) Regulations, No. 1 of
2008-Directive Principles of State Policy-Rio Declaration on Development and
the Environment, 1992-Public Trust doctrine-The 'Polluter Pays' principle
The petitioner filed this application as public interest litigation on behalf of
himself and the residents of Chunnakam, Jaffna District. He complained that the
activities of the 8th respondent Northern Power Company (Pvt) Ltd (NPCL), which
had been operating a thermal power station in Chunnakam since December 2009, was
causing pollution of the groundwater and soil in the area, making the
groundwater unfit for human consumption. He alleged that the Central
Environmental Authority (CEA), Ceylon Electricity
Board (CEB), Board of Investment
of Sri Lanka (BOI), National Water Supply and Drainage Board (NWSDB) and the
Provincial and Local Authorities had failed to enforce the law against the 8th
respondent and had failed to stop the 8th respondent from polluting groundwater
and soil, thereby violating the fundamental rights of the petitioner and the
residents of Chunnakam under Article 12(1) of the Constitution.
NPCL's power station was constructed in 2007 in the same complex as the
Chunnakam Power Station which was operated by the CEB until 2012, the private "Aggreko"
power station which functioned for close to a decade until it was closed down in
2012, and the CEB's new "Uthuru Janani" power station which began operating in
2013. NPCL's power station originally had a generation capacity of 15MW, which
was supplied to the National Grid under a power purchase agreement with the CEB.
Somewhere between 2012 and 2013, the generation capacity was enhanced to 27MW.
Since 2008, residents of Chunnakam had complained of pollution in groundwater
and soil in the area around the CEB complex. This was confirmed by several
reports and studies carried out between 2008 and 2017, which found that
groundwater in the area had been contaminated with oil. In 2012, the NWSDB had
to cease distribution of pipe-borne water from its intake well in Chunnakam as
the well was contaminated with petroleum waste.
It was not disputed that NPCL had not carried out an Initial Environmental
Examination Report (JEER) or Environmental Impact Assessment Report (EIAR)
either prior to the construction of the power station in 2007, or prior to the
enhancement of its capacity in 2012-2013. The first Environmental Protection
License (EPL) was issued to NPCL by the CEA in May 2020, after the power station
had been in operation for over five months. Thereafter, EPLs were issued to NPCL
by the BOI, since NPCL was a Company registered under the BOI. In November 2014,
the CEA issued a Scheduled Waste Management License (SWML) to NPCL. There were
lapses of several months in renewing the EPLs by NPCL, during which time the
power station continued to operate.
lt was the respondents' position that as a result of practical difficulties,
including the absence of a branch office of the CEA functioning in the Jaffna
Peninsula in 2007, no institution was in a position to travel to Chunnakam to
inspect and make an assessment of NPCL's power station prior to the end of the
war in 2009. NPCL pleaded that it obtained the necessary EPLs as soon as
practicable after the end of the war in May
2009, and the issue of these EPLs
confirms that NPCL was operating within the parameters of the law. The
respondents also pointed out that duri