BANDAPPUHAMY v. SWAMY PILLAI
NLR52V234



Bandappuhamy V. Swamy Pillai

1950 Present: Dias S.P.J. and Pulle J.

BANDAPPUHAMY,
Appellant, and SWAMY PILLAI. Respondent

 S. C. 5.27-D. C. Colombo, 119 Z

Servitude-Right of lateral support-Breach of it-Quantum of damage- claimable.

Plaintiff sued the defendant for damages for cutting earth from his (defendant's) premises so as to deprive of lateral support a contiguous allotment of land belonging to the plaintiff.

Held, that the damages that could be claimed should be restricted to what was incurred by, and naturally flowed from, the subsidence of soil which actually resulted from the excavations. Plaintiff was not entitled to claim the cost of putting up a retaining wall to prevent further damage.

APPEAL from a judgment of the District Court, Colombo.

 H. W. Jayewardene, for the defendant appellant.

Kingsley Herat, for the plaintiff respondent.

Cur. adv. vult.

May 24, 1950. PULLE J.-

The defendant in this case appeals from a judgment awarding the plaintiff a sum of Rs. 400 as damages for cutting earth on his own land so as to deprive a contiguous allotment of land belonging to the plaintiff of lateral support.

In his plaint the plaintiff alleged that the defendant in August, 1944, out earth not only on his own land but encroached on the plaintiff's laud by excavating and cutting into his soil below the surface level. At the trial, however, the scope of the action was restricted to the issues whether the defendant in or about August, 1944, cut earth from his own

premises so as to deprive the plaintiff of his right of lateral support, and if so, to what damages was plaintiff entitled. A survey had previously established that the surface under plaintiff's land had not been cut into. On the facts the learned District Judge found substantially in favour of the plaintiff. It would appear that the defendant's land is contiguous to and lies on the south-west of plaintiff's land. They were separated by what is described as a barbed wire live fence. The plaintiff's land was at a higher elevation and sloped gradually down to defendant's land. During the passage of rain water the plaintiff's land would not suffer from anything more than the normal wear and tear of bad weather but the position would be entirely different if along the boundary the defendant cut earth to an average depth of about five feet. Water falling on plaintiff's land would gather an abnormal momentum causing substantial loss by erosion in course of time.

It is clear from the evidence that in or about August, 1944, the defendant had cut earth on his own land practically along half the length of the boundary, a distance of seventy-two feet, causing a perpendicular drop of about five feet. Along this portion of the boundary were two trees which formed part of the fence. These and an arecanut tree collapsed as a result of the excavation and earth washed off in this area exposed the roots of other fence trees.

It is not contested that the collapse of the two fence trees and the arecanut tree and some damage to the fence were due to the subsidence of the soil caused by the excavation. Had the plaintiff sought compensation for the loss of the trees and cost of consolidating the fence, his claim would have been unanswerable. He thought, however, that he should protect himself against all damage in the future and requested a carpenter-mason to prepare an estimate for the construction of a 13-foot wall, 16 inches thick to prevent the washing away of his land. It was on the basis of this estimate that plaintiff claimed Rs. 1,090 as damages

On the authority of the case of Pedris v. Batcha,1[(1924) 26 N. L. R. 89.] it was submitted to the trial Judge on behalf of the defendant that the plaintiff was not entitled to claim damages in respect of the subsidence which the plaintiff feared might occur in the future and that damages could not be assessed on the basis of the costs of constructing a retaining wall to preven