HIGH COURT OF DELHI
SIMPLEX CONCRETE PILES (INDIA) LTD. – Appellant
Versus
UNION OF INDIA – Respondent
CS(OS)-1259_2000
CS(OS) No.1259/2000
Page 1
*
IN THE HIGH COURT OF DELHI AT NEW DELHI
+
CS(OS) No.1259/2000
7th January, 2010
SIMPLEX CONCRETE PILES (INDIA) LTD.
...Petitioner
Through:
Mr. V.P.Chaudhry, Senior Advocate with
Mr. Nitinjya Chaudhry, Advocate and
Ms. Sushma Sachdeva, Advocate.
VERSUS
UNION OF INDIA
....Respondent
Through: Mr. B.V. Niren, Advocate.
CORAM:
HON’BLE MR. JUSTICE VALMIKI J.MEHTA
1.Whether the Reporters of local papers may be allowed to see
the judgment?
2. To be referred to the Reporter or not?
3.Whether the judgment should be reported in the Digest?
%
JUDGMENT (ORAL)
VALMIKI J.MEHTA, J
I.A. No.6442/2001 in CS(OS) No. 1259/2000
1. By this application, the respondent/Union of India has preferred
objections under Sections 30 & 33 of the Arbitration Act, 1940 to the Award
dated 28.2.2000 passed by the sole Arbitrator. The disputes which arose
between the parties pertained to awarding of a contract by the objector to the
petitioner for construction work of foundation and basement of the RR Hospital
at Delhi Cantonment. The counsel for the objector has only pressed the
2010:DHC:42
CS(OS) No.1259/2000
Page 2
objections as regards for Claim Nos. 2,7,12,18,26,27 and the Claim of interest,
as decided by the Award. I shall take up the arguments of the parties with
respect to each claim one by one.
2. The first objection pertains to award of a sum of Rs.14,39,340/- under
Claim No.2 by the Arbitrator. This amount has been awarded by the Arbitrator
because the Arbitrator has held that over-breaks in the rock base naturally occur
in the process of blasting and therefore, except to the extent of small
irregularities/levelling, where RCC is required to be filled up for levelling, the
excess filling of RCC has to be to the account of the objector where the over-
beaks in the rocks are of a large extent.
3. In order to appreciate the respective contentions of the parties it is
necessary to refer to the relevant terms of the contract being Clauses 3.1.3, 3.1.4
and the Schedule A of the contract which contains the list/descriptions of the
items of works. The relevant Clauses and items in Schedule A read as under:
“3.1.3
The bottom surface of excavation in rock shall be made as
level and true as possible prior to laying concrete, and any small
irregularities shall be filled up with cement concrete (1:4:8) at no extra
cost to Government.
3.1.4
In case excavation is done to depths greater than those
required, extra depth shall be made up with cement concrete (1:4:8) at no
extra cost to Government.”
“
3. Excavation over areas
not
exceeding
1.5
metre
deep
in
soft/disintegrated rock
and getting out
Per
Cubic
Metre
5000 Rs.50/-
Rupees fifty
only
2,50,000/-
4. Ditto
but
depth
exceeding 1.5 metre
and not exceeding 3
Per
Cubic
Metre
20000 Rs.55/-
Rupees fifty
five only
11,00,000
2010:DHC:42
CS(OS) No.1259/2000
Page 3
metre.
5. Excavating
over
areas, exceeding 1.5
metre deep but not
exceeding
3
metre
deep in hard rock and
getting
out
and
property stacking for
measurement.
Per
Cubic
Metre
7500 Rs.180/-
Rupees one
hundred
eighty only
13,50,000/-
6. Ditto-but
depth
exceeding
3
metre
and not exceeding 4.5
metre and ditto-
Per
Cubic
Metre
7500 Rs.185/-
Rupees One
hundred
eighty five
only
13,87,500/-
On the basis of these provisions the Arbitrator has accepted the
arguments and contentions of the claimant/petitioner/contractor and has held as
under:-
“ 47.8
There is no other provision in contract regulating the excavation
in hard rock or concerning this aspect. One has to analyse these provisions to
find out as to what the contract intended. Clause 3.1.3 deals with excavation in
hard rock while Clause 3.1.4 is generalistic in nature possibly covering all
types of excavations. Further, Clause 3.1.4 states that “In case excavation is
done” covering thereby the situa