SupremeToday Landscape Ad

Top Stories

View All
Can a Bank File Order 7 Rule 11 and Set Aside Petitions Through Different Authorised Persons?

When a Bank's Order 7 Rule 11 Petition and Set Aside Application Are Filed by Different Authorised Representatives

Banks and companies litigate constantly, and they almost always act through officers or agents who hold some form of authorisation — a power of attorney, a board resolution, or an internal delegation. Problems arise when the authorisation chain is inconsistent: one officer signs and files an application under Order 7 Rule 11 CPC seeking rejection of a plaint, and later a different authorised person files a petition to set aside an order in the same suit. The opposing party then objects: can two different authorised persons genuinely represent the same plaintiff-bank within one proceeding?

This question sits at the intersection of several procedural provisions of the Code of Civil Procedure, 1908 — Order 6 Rules 14 and 15, Order 29 Rule 1, Order 7 Rule 11, and Order 9 Rule 13. The short answer is that a change or substitution of authorised representative is generally permissible, but each filing must be backed by valid authority at the time it is made.

The Legal Framework on Authorisation

Under Order 6, Rule 14, CPC, pleadings must be signed by the party and its pleader. Where the party cannot sign, the pleading may be signed by any person duly authorised by him to sign or to sue or defend on its behalf 1991 0 Supreme(MP) 166 and 1959 0 Supreme(Bom) 102. Order 29, Rule 1, similarly requires that pleadings signed on behalf of a corporation be signed by the secretary, a director, or a principal officer duly authorised.

Courts have clarified several important points about what duly authorised means:

  • Oral authorisation is sufficient. For a company, the Managing Director can orally authorise another person to sign the plaint; a written power of attorney is not always mandatory 1959 0 Supreme(Bom) 102.
  • Juristic persons need not prove authority in detail. When the plaintiff is a statutorily incorporated bank or company, the person suing need not expressly state the source of authority in the plaint. Where authority is specifically averred and not denied in the written statement, no proof by production of the document is required 1991 0 Supreme(MP) 166.
  • Defects are curable. Irregularities in signature, verification, or presentation of the plaint are procedural in nature and can be cured at any stage, even after limitation. A plaint does not cease to be a plaint merely because of such defects, and Order 7 Rule 11 does not list them as grounds for rejection 1959 0 Supreme(Bom) 102 and 2010 0 Supreme(Mad) 5194.

When the Authorised Person Changes Mid-Suit

The substitution of an authorised representative is treated as a procedural matter that courts routinely permit, provided the substitution does not change the nature of the suit 2018 0 Supreme(Del) 1849. Courts have allowed such substitution even during the pendency of related applications, and the possibility that an amendment may affect jurisdiction is not by itself a ground for refusing the substitution.

Applied to the query: if a bank's first authorised person files an Order 7 Rule 11 petition and a later, differently authorised person files an application to set aside an order, the second filing is typically maintainable so long as:

  1. The second person holds a valid, subsisting authorisation (power of attorney, board resolution, or notification) from the bank at the time of filing;
  2. The substitution does not alter the character of the proceedings; and
  3. Any objection to the substitution is raised before the trial court, where questions of the validity of the power of attorney and its execution are to be agitated during trial rather than as a threshold bar 2001 0 Supreme(Mad) 164.

The Other Side: When Lack of Authority Is Fatal

The position is not uniformly liberal. Several decisions emphasise that proceedings filed by a person without authority suffer from serious defects:

  • A suit or petition filed by a person not duly authorised by a company cannot be entertained; the person filing must be duly authorised by a power of attorney or a board resolution 2026 0 Supreme(Del) 496 and 0110008325.
  • Under the Insolvency and Bankruptcy Code, a power of attorney holder must be backed by a board resolution for the filing; an unauthorised signatory renders the petition non-maintainable 2024 Supreme(Online)(NCLT) 1666.
  • In cheque complaint cases, a manager who filed a complaint without authorisation could not cure the defect by a ratification letter filed a year later, because ratification cannot validate proceedings that were incompetent when filed and had become time-barred in the interim 1996 0 Supreme(AP) 1218 and 1998 Supreme(Online)(AP) 1.
  • In government litigation, only officers appointed under Order 27 Rule 1 CPC may sign and verify pleadings on behalf of the government, and this power cannot be delegated to unappointed officers 2022 0 Supreme(All) 376.
  • Courts have held that suits not filed by a person authorised under Order 29 Rule 1 are not maintainable

    M/S. FOMENTO RESORTS AND HOTELS LTD THROUGH COMPANY SECRETARY ISHWAR B. MUCHANDI vs DR. AMILCAR CUNHA SOUZA AND ANR

    Hotel Ornate (Nilgiry) Private Limited vs Lakshmipriya Nagendran

    .

The governing principle in these cases is that a company may repudiate a decree or order passed at the instance of an unauthorised person, because such proceedings have financial consequences that must bind the company knowingly 1996 0 Supreme(AP) 1218. However, where procedural defects are curable, courts prefer substance over form: a defective presentation of a plaint cannot result in the rejection of the plaint, and curable irregularities should not defeat substantive rights or cause injustice 2010 0 Supreme(Mad) 5194.

Setting Aside Orders and Due Diligence

Once the Order 7 Rule 11 petition has been decided or an ex-parte order passed, the remedy lies in an application to set aside — typically under Order 9 Rule 13 CPC for ex-parte decrees. A party pursuing such relief may also seek a writ direction under Article 227 of the Constitution for expeditious disposal of the pending application 2013 0 Supreme(Raj) 980. But the courts also apply a due diligence test: a party cannot obtain relief on the ground that its authorised representative failed to act if it never took steps to contact the representative or enquire about the proceedings 2004 0 Supreme(Cal) 87.

Practical Takeaways for Banks and Corporate Litigants

  • Maintain a clear chain of authorisation: board resolutions, powers of attorney, and internal delegations should expressly permit filing suits, applications, and petitions.
  • When substituting an authorised representative, file a formal substitution application along with the fresh authorisation document rather than simply filing through a new person.
  • Ensure the authorisation covers the specific stage — signing pleadings, verification, filing applications, and arguing — because narrower notifications (as seen in government litigation) cannot be informally expanded 2022 0 Supreme(All) 376.
  • Raise or respond to authorisation objections at the trial stage, where the validity of the power of attorney and its execution can be tested on evidence 2001 0 Supreme(Mad) 164.
  • Remember that an Order 7 Rule 11 challenge belongs before the trial court; Article 227 is not a substitute when the CPC provides an enabling remedy 2013 0 Supreme(Mad) 1754.

Conclusion

Filing an Order 7 Rule 11 petition through one authorised person and a set aside petition through another is, generally speaking, maintainable — the substitution of authorised representatives during a suit is a recognised procedural step, and defects in signing or verification are curable irregularities 2018 0 Supreme(Del) 1849 and 1959 0 Supreme(Bom) 102. What courts insist upon is that each act of filing be independently supported by valid authorisation at the time it is made; otherwise the filing may be treated as a nullity, and late ratification may not save it 1996 0 Supreme(AP) 1218 and 2024 Supreme(Online)(NCLT) 1666. The practical answer is careful documentation of authority at every step of the litigation. This discussion is general information based on reported decisions and does not constitute advice on any specific dispute.

#CPC1908 #Order7Rule11 #BankingLitigation #AuthorisedRepresentative #CivilProcedure
Chat Download
Chat Print
Chat R ALL
Landmark
Strategy
Argument
Risk
Chat Voice Bottom Icon
Chat Sent Bottom Icon
SupremeToday Portrait Ad
whatsapp-icon Back to top