On , the set aside the denial of , interest and penalties against Power Systems Private Limited. The bench held that transferred under a remain eligible for and that the value of such goods falling outside the levy does not attract the bar in the of the . It further held that the department could not deny credit merely because the goods became part of an .
, a manufacturer of turbines, generators, motors and rotary converters, had engaged contractors to design, supply, install, test and commission systems for a new plant at its Manali factory. The work covered heating and ventilation equipment, transformers, electrical works, fire protection systems and industrial water systems. The company issued letters of intent and then separate purchase orders for equipment supply and for installation, testing and commissioning. Contractors procured the goods from manufacturers and dealers, with excise naming the contractors as buyers and as consignee at its factory. The contractors separately charged for erection and commissioning services.
Relying on those invoices, claimed on the goods as and on the for erection services. The department denied the claim, treating the contracts as . It argued that the contractors had created an immovable, non-excisable plant and that of the , read with the , barred credit. The adjudicating authority confirmed the demand, interest and penalty, and the Commissioner (Appeals) upheld that order.
A credit that survived the label
Before the Tribunal, argued that the goods satisfied the definition in , had been received at its factory and were used to manufacture . It added that clarification on the did not decide whether credit could be claimed on duty-paid components used in those plants. insisted that the contracts were composite and that separate purchase orders merely facilitated the credit claim.
The Tribunal accepted that the contracts were, in substance, works contracts and that ownership passed to , at the latest, when the contractors incorporated the goods into the plant. That did not defeat the credit claim. The goods were covered by , received at the factory and used as components of the manufacturing plant. The provisions, the Tribunal held, did not require the claimant to own the goods at receipt or to install them itself.
The bench also refused to infer a disqualification from the plant's immovable character. “If the immovability of an installed plant defeated credit on its components, credit would be unavailable for most of the goods for which the definition was framed,” it observed.
Exclusion from the levy is not an exemption
The central dispute turned on the , which bars credit when goods or services are exempted from . The department said the exclusion of the value of goods in works contracts, reflected in and , operated as an exemption. The Tribunal disagreed. It drew a line between goods whose value lies outside the levy and goods that are exempted from an otherwise applicable levy. The value of goods supplied in a is not charged to at all, making the exclusion a boundary of the levy rather than a concession within it.
The bench stated:
“We hold, on the third issue, that the does not bar the appellant's credit for either period. In a the value of the goods transferred lies outside the levy of , and no exemption in respect of it, whether claimed under or said to arise under , can attract the Explanation.”
The distinction matters because the Explanation can strip credit even when the underlying transaction appears to be a service. By holding that a from is not an exemption, the Tribunal removed 's main textual argument for denying credit on goods embedded in works contracts.
Disclosure defeated the extended limitation period
The Tribunal also rejected the department's use of the . had claimed credit on , recorded it in its and disclosed it in its returns. There was no , and the extended period was therefore unavailable for reopening the claim.
The practical consequence is direct: manufacturers who receive through contractors and account for the credit transparently can protect themselves from , even if later disputes the legal basis of the credit.
The Tribunal allowed both appeals, set aside the and granted . now stands absolved of the confirmed demand, interest and penalties, and the ruling confirms that credit eligibility for is determined by duty-paid receipt and use in manufacture rather than by the label given to the underlying contract.
capital goods CENVAT credit eligibility - works contract service tax valuation - denial of CENVAT credit by tax department - immovable plant capital goods - extended period of limitation