1997 Supreme(Raj) 512
Rajasthan High Court
Honble J.C. VERMA, J.
Shiv Dutt Bissa - Appellant
Versus
State of Rajasthan and Others - Respondents
S.B. Civil Writ Petition No. 2590 of 1995
Decided On : July 11, 1997
M.R. Singhvi and Anand Purohit, for Petitioner P.C. Sharma, for Respondents
Headnote:Rajasthan Service of Engineers (Public Health & Engineering Department) Service Rules, 1968 – Rajasthan Civil Services (Classification, Control & Appeal) Rules, 1958 – Rule 17 – Procedure for imposing minor penalties – In the present case there are no allegations of misappropriation or loss caused to the Government – The alleged misconduct is that petitioner exceeded of his limits to place the order – Minor penalty was imposed – Petitioner claimed that this has been done to obstruct his chances of promotion – The Rule 17 has not been correctly applied in the case – There is no speaking order for imposing penalty – Raj. High Court rulings were relied. (Paras 16, 19 & 20)
Misconduct. This Court in R.K. Sharma vs. State (6), had held while deciding the case under the rules of 1958 that the misconduct means intentional wrong doing and it implies failure to act honestly and reasonably either according to the ordinary and natural standard or according to the standard of a particular profession, and it does not cover mere negligence in duty. (Para 19)
No exhaustive definition of the misconduct can be given or any limits can be imposed while defining misconduct. Each case depends on its own facts in regard to commission of misconduct. (Para 20)
(2). It is alleged that as per Govt. Instruction dated 28.10.1988 (Annex.3), it hadbeen provided that ``as far as possible order shall be issued to all the firms in accordance with the rate contract as per demand, but the order shall be issued to one firm for three lacs only and in a circle, no order more than Rs. 5 lacs can be placed without obtaining the prior permission of the office of Chief Engineer. The allegations state that the petitioner was competent to place the orders upto Rs. 5lacks and if any order above Rs. 5 lacs for purchase of material was to be placed in that situation, prior permission of Chief Engineer was required. Admittedly in the facts and circumstances of the case, petitioner had placed orders of more than Rs. 10 lacks to the firm with simultaneous intimation to the Chief Engineer for approving the action, in view of the urgent need required for obtaining the joints for layingdown the water pipes which water pipes were lying at the spot but could not be utilised without the joints. Admittedly the payment was to be made by the concerned Officer i.e. Chief Engineer after receipt of the material. The petitioner had submitted the reply to the charge- sheet vide Annex.2 dated 7.12.1992. It was stated by the petitioner that many water schemes were in progress at as many as 11 placesinvolving huge expenses including the emergency schemes at Jalore & Pali where p