NATIONAL GREEN TRIBUNAL CHENNAI (SOUTHERN ZONE BENCH)
PUSHPA SATHYANARAYANA, Judicial Member, SATYAGOPAL KORLAPATI, Expert Member
MAHESH MAMINDLA – Appellant
Versus
STATE OF TELANGANA – Respondent
Appeal No.82 of 2021 (SZ)|I.A. Nos.213 of 2021 & 81 of 2022 (SZ)
| Table of Content |
|---|
| 1. challenge to forest clearances for transmission line. (Para 1 , 2) |
| 2. appellant's claims of concealment and ecological harm. (Para 3 , 4 , 26) |
| 3. forest department's compliance and esz permissions. (Para 5 , 6 , 7 , 8 , 9 , 10 , 11 , 12) |
| 4. moef&cc's scrutiny and conditional stage-i approval. (Para 13) |
| 5. project proponent's technical and route justifications. (Para 14 , 15 , 16 , 17 , 18 , 19 , 20 , 21 , 22 , 23 , 24 , 27 , 28) |
| 6. court verifies procedures and dismisses major claims. (Para 25 , 29 , 30 , 31 , 32 , 34) |
| 7. penalty for unapproved quad pole deviation. (Para 35 , 36 , 37 , 38) |
| 8. appeal dismissed with penalty order. (Para 39 , 40) |
JUDGEMENT
Delivered by Smt. Justice Pushpa Sathyanarayana, Judicial Member.
1. The above appeal is filed under Sections 16(e) read with Section 20 of the National Green Tribunal Act, 2010 challenging the legality and correctness of the Stage-I Forest Clearance vide Letter No.4-TSC180/2021-HYD/091 dated 13.05.2021 and Stage-II Forest Clearance vide Letter No.4- TSC180/2021-HYD/155 dated 07.12.2021 which are granted by the 4th Respondent / Ministry of Environment, Forest and Climate Change, Integrated Regional Office, Hyderabad and the Working Permission bearing No.13470/2019/FC-4 dated 07.08.2021 granted by the Principal Chief Conservator of Forests, Government of Telangana.
2. The permissions stated supra are said to have been granted to the 2nd Respondent/ Project Proponent viz., Transmission Corporation of Telangana Limited (TS TRANSCO) for erection and installation of 400 KV Overhead DC transmission lines from Kethireddipally 400 KV SS to 400 KV Rayadurg GIS along the Outer Ring Road (ORR), Shamshabad Division, Telangana, and passing through forest area admeasuring 6.7075 ha. having a length of 1.458 Km and width of 46 Metres, situated within Chilkur Reserve Forestland proposed to be diverted for the said project.
3. The appellant contends that the erection and installation of overhead DC transmission lines include totally 150 pillars of various sizes to carry High Tension Electricity Cables, all arranged linearly with cables and fencing, which are likely to block the pathway of faunal movement within the forest area and pose potential hazards to faunal migration through the forest area.
4. The appellant raised the following substantial issues for quashing the Forest Clearances granted:-
4.1 The TRANSCO has provided only the map of the land required for diversion and has deliberately concealed the entire details of the cadastral map along with measurements of the Mrugavani National Park, Chilkur Reserve Forest and the eco-sensitive zone and hence, no boundary verification survey has been done or produced to identify, demarcate and verify whether the erection of the transmission lines are taking place within the boundary of the National Park.
4.2 Serial No. 8 (iii) of Form A Part II which is filled by the Deputy Conservator of Forest for obtaining Forest Clearance provides wrongful, misleading and incorrect information by stating that the forest land proposed for diversion for the erection of transmission line is not located within the eco-sensitive zone of Mrugavani National Park which is erroneous.
4.3 The Stage-II Clearance dated 07.12.2021 reveals that the project is falling inside the Eco-Sensitive Zone and asks for the preparation of a Wildlife Mitigation Plan by any competent person / agency with the approval of the Chief Wildlife Warden. Therefore, it is clear that while granting Stage-I and Stage-II Clearance, the IRO of MoEF&CC did not apply its mind with respect to the impact of the overhead transmission line on the wildlife of the area. This becomes more important because of the proximity of the forest land diverted and the erection of transmission lines to the Mrugavani National Park and to several water bodies nearby supporting bird life in the area.
4.4 Furnishing of incorrect and misleading information by stating that the forest land proposed for diversion is not with
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.