2024 Supreme(Online)(NGT) 1199

NATIONAL GREEN TRIBUNAL CHENNAI (SOUTHERN ZONE BENCH)
PUSHPA SATHYANARAYANA, Judicial Member, SATYAGOPAL KORLAPATI, Expert Member
MAHESH MAMINDLA – Appellant
Versus
STATE OF TELANGANA – Respondent
Appeal No.82 of 2021 (SZ)|I.A. Nos.213 of 2021 & 81 of 2022 (SZ)



Advocates:
For Appellant(s): Mr. Ritwick Dutta, Mr. Rahul Choudhary, Mr. G. Stanly Hebzon Singh
For Respondent(s): Mrs. H. Yasmeen Ali, Mr. Y. Rama Rao, Mr. B. Lakshmi Narasimhan, Mrs. ME. Sarashwathy, Mr. T. Sai Krishnan, Ms. C.P. Kavitha Renjini

Forest clearances upheld despite initial form discrepancies where supervisory authorities verified via DSS, examined alternatives, imposed wildlife mitigations; deviation from approved tower type penalized but project not quashed given completion and public interest.

Headnote:(A) National Green Tribunal Act, 2010 - Sections 16(e) and 20 - Forest (Conservation) Act, 1980 - Challenge to Stage-I and Stage-II Forest Clearances and Working Permission for 400 KV overhead DC transmission line through 6.7075 ha forest land (1.458 Km length, 46m width) in reserve forest adjacent to national park - Appellants alleged concealment of eco-sensitive zone location (55-300m from national park), misleading information in Form A Part II denying ESZ and proximity to protected area within 1 Km, non-examination of alternatives including underground cabling, forest fragmentation, wildlife hazards, avian impacts, and violation of buffer zone guidelines prohibiting structures within 15m of outer ring road - Authorities countered with verification via DSS analysis identifying ESZ, obtaining ESZ committee permission, REC recommendations post-clarifications on alternatives, imposition of conditions like wildlife mitigation plan (Rs.545.063 Lakhs), dwarf medicinal plantation, bird deflectors, minimal tree felling, translocation, and confirmation project outside park boundary per DGPS survey despite notified area discrepancy (360 ha vs 287 ha) - No cost-benefit analysis required for <20 ha diversion - Underground cabling infeasible due to technical constraints (1000 sqm switchyards needed) - Project along existing road, no additional fragmentation, underpasses pre-existing - Deviation from approved monopoles to quad poles without amendment for financial reasons - Tribunal held supervisory scrutiny by IRO/REC rectified Form A omissions, alternatives examined selecting minimal forest route post permissions denied elsewhere, boundary demarcated per notification, Supreme Court orders on underground cabling for endangered species inapplicable, but penalized deviation. Penalty of Rs.50 Lakhs imposed on project proponent payable to IRO for national park and forest improvement, project upheld given completion and public interest. (Paras 1-39)

(B) Environmental Clearances - Application of mind and supervisory role - Discrepancies/misinformation in initial forms (e.g., Form A denying ESZ/proximity) not fatal if higher authorities verify via DSS, seek clarifications, impose mitigation, and follow guidelines; mechanical approvals quashable but detailed REC deliberation suffices. (Paras 29, 34, 38)

Facts of the case:
Appeal challenging forest clearances for overhead transmission line through reserve forest near national park (ESZ), alleging procedural lapses, concealment, alternatives ignored, ecological harm; respondents defended compliance, verifications, mitigations; project completed/operational.

Findings of Court:
Clearances valid post supervisory corrections; deviation penalized Rs.50 Lakhs for park/forest enhancement; no quashing/revocation.

Issues: Validity of clearances amid Form A discrepancies, ESZ/proximity concealment, alternatives examination (underground/ non-forest routes), fragmentation/wildlife impacts, tower type deviation, boundary survey adequacy.

Ratio Decidendi: Forest clearances sustainable if supervisory bodies apply mind, verify discrepancies, impose tailored mitigations despite initial errors; avoidable diversions rejected where alternatives proven infeasible post permissions/examinations; post-completion public utility weighs against dismantling absent grave illegality.

Result: Appeal disposed; penalty imposed, I.As. closed.

Table of Content
1. challenge to forest clearances for transmission line. (Para 1 , 2)
2. appellant's claims of concealment and ecological harm. (Para 3 , 4 , 26)
3. forest department's compliance and esz permissions. (Para 5 , 6 , 7 , 8 , 9 , 10 , 11 , 12)
4. moef&cc's scrutiny and conditional stage-i approval. (Para 13)
5. project proponent's technical and route justifications. (Para 14 , 15 , 16 , 17 , 18 , 19 , 20 , 21 , 22 , 23 , 24 , 27 , 28)
6. court verifies procedures and dismisses major claims. (Para 25 , 29 , 30 , 31 , 32 , 34)
7. penalty for unapproved quad pole deviation. (Para 35 , 36 , 37 , 38)
8. appeal dismissed with penalty order. (Para 39 , 40)

JUDGEMENT

Delivered by Smt. Justice Pushpa Sathyanarayana, Judicial Member.

1. The above appeal is filed under Sections 16(e) read with Section 20 of the National Green Tribunal Act, 2010 challenging the legality and correctness of the Stage-I Forest Clearance vide Letter No.4-TSC180/2021-HYD/091 dated 13.05.2021 and Stage-II Forest Clearance vide Letter No.4- TSC180/2021-HYD/155 dated 07.12.2021 which are granted by the 4th Respondent / Ministry of Environment, Forest and Climate Change, Integrated Regional Office, Hyderabad and the Working Permission bearing No.13470/2019/FC-4 dated 07.08.2021 granted by the Principal Chief Conservator of Forests, Government of Telangana.

2. The permissions stated supra are said to have been granted to the 2nd Respondent/ Project Proponent viz., Transmission Corporation of Telangana Limited (TS TRANSCO) for erection and installation of 400 KV Overhead DC transmission lines from Kethireddipally 400 KV SS to 400 KV Rayadurg GIS along the Outer Ring Road (ORR), Shamshabad Division, Telangana, and passing through forest area admeasuring 6.7075 ha. having a length of 1.458 Km and width of 46 Metres, situated within Chilkur Reserve Forestland proposed to be diverted for the said project.

3. The appellant contends that the erection and installation of overhead DC transmission lines include totally 150 pillars of various sizes to carry High Tension Electricity Cables, all arranged linearly with cables and fencing, which are likely to block the pathway of faunal movement within the forest area and pose potential hazards to faunal migration through the forest area.

4. The appellant raised the following substantial issues for quashing the Forest Clearances granted:-

4.1 The TRANSCO has provided only the map of the land required for diversion and has deliberately concealed the entire details of the cadastral map along with measurements of the Mrugavani National Park, Chilkur Reserve Forest and the eco-sensitive zone and hence, no boundary verification survey has been done or produced to identify, demarcate and verify whether the erection of the transmission lines are taking place within the boundary of the National Park.

4.2 Serial No. 8 (iii) of Form A Part II which is filled by the Deputy Conservator of Forest for obtaining Forest Clearance provides wrongful, misleading and incorrect information by stating that the forest land proposed for diversion for the erection of transmission line is not located within the eco-sensitive zone of Mrugavani National Park which is erroneous.

4.3 The Stage-II Clearance dated 07.12.2021 reveals that the project is falling inside the Eco-Sensitive Zone and asks for the preparation of a Wildlife Mitigation Plan by any competent person / agency with the approval of the Chief Wildlife Warden. Therefore, it is clear that while granting Stage-I and Stage-II Clearance, the IRO of MoEF&CC did not apply its mind with respect to the impact of the overhead transmission line on the wildlife of the area. This becomes more important because of the proximity of the forest land diverted and the erection of transmission lines to the Mrugavani National Park and to several water bodies nearby supporting bird life in the area.

4.4 Furnishing of incorrect and misleading information by stating that the forest land proposed for diversion is not with

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top