NATIONAL GREEN TRIBUNAL KOLKATA (EASTERN ZONE BENCH)
B. Amit Sthalekar, Judicial Member, Arun Kumar Verma, Expert Member
Santoshpur Mitali Sangha – Appellant
Versus
State of West Bengal – Respondent
Original Application No.82/2023/EZ|Execution Application No.03/2024/EZ
| Table of Content |
|---|
| 1. gaushala violates pollution consents and siting norms (Para 1 , 2 , 3 , 4 , 5 , 6) |
| 2. committee inspection reveals environmental violations (Para 7 , 9 , 10) |
| 3. cpcb guidelines mandate waste management practices (Para 12 , 13 , 14 , 15 , 16 , 17) |
“ORDER
1. Ms. Shipra Naskar, learned Counsel files Vakalatnama on behalf of the Respondent Nos.7 & 8; the same is taken on record.
2. We have heard the learned Counsel for the parties in part.
3. Considering the Report of the Committee of an Inspection/Enquiry conducted on 29.08.2023, we are of the view that in the interregnum a boundary wall to the Gaushala needs to be constructed on an urgent basis to ensure that there is no outflow of cow dung, bovine urine, sewage, waste water into the adjoining areas.
I.A. No.12/2024/EZ:-
4. This Interlocutory Application has been filed by Respondent No.8 with the prayer that he may be provided police assistance in the erection of the boundary wall along the periphery of the Suravi Sadan Gaushala in Mouza-Santoshpur, P.S.-Barasat, District North
24 Parganas.
5. The allegation in his Interlocutory Application is that the local persons are preventing him from construction of the boundary wall with the result that some of the findings noted in the Committee Report are being rendered unimplementable.
6. Mr. Ritwick Dutta, learned Counsel for the Applicant of the Original Application states that the Applicant has no objection if boundary wall is permitted to be constructed in the interregnum. Learned Counsel also suggested that construction of boundary wall would not suffice unless a proper drainage/garland drain is also constructed to contain the flow of sewage/slush/bovine urine and bovine waste etc.
7. We, therefore, allow the I.A. No.12/2024/EZ and direct the Respondent Nos.7 & 8 to construct a boundary wall of adequate height ensuring impermeability of sewage/slush/bovine urine/bovine waste from flowing to the outside. The said respondents shall also construct a garland drain to contain the outflow of bovine sewage, urine, cow dung etc. 8. Let the said construction of boundary wall and garland drain be constructed within two months i.e. by 31.05.2024
9. I.A. No.12/2024/EZ is accordingly disposed of.
10. We also find that the Enquiry Committee had conducted enquiry on 29.08.2023 and thereafter, Consent to Operate (CTO) was granted to the Respondent Nos.7 & 8, Gaushala, on 21.09.2023. The Report clearly mentions that 150 KLD of water is being utilized by the Gaushala whereas the Consent to Operate (CTO) has been granted only for 40 KLD. We wonder whether the West Bengal Pollution Control Board had taken the Committee Report into consideration before granting Consent to Operate (CTO).
11. We are also of the view that since the Consent to Operate (CTO) was granted on 21.09.2023, a fresh Inspection Report is required from the West Bengal Pollution Control Board with regard to the compliance of the conditions mentioned in the Consent to Operate (CTO) particularly with reference to the findings of the Enquiry Committee of the enquiry dated 29.08.2023.
12. We, therefore, direct the West Bengal Pollution Control Board to carry out its fresh inspection by 07.06.2024 particularly bearing in mind the compliances of the conditions given in the Consent to Operate with reference to the CPCB guidelines dated July, 2021 and the Report should be submitted by the first week of July, 2024.
13. Mr. Suman Dutt, learned Counsel for the Respondent Nos.7 & 8 further submitted that since the Gaushala is located in a rural area there is no adequate drainage system and, therefore, disposal of the slush, slurry and bovine urine after treatment would still remain a problem for which suggestions have to be given by the West Bengal Pollution Control Board.
14. The submission Mr. Suman Dutt, learned Counsel for Respondent Nos.7 & 8 has been disputed by Mr. Ritwick Dutta, learned Counsel for the Applicant. Considering the same, we direct the West Bengal Pollution Control Board t
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.