2020 MarsdenLR 900

HIGH COURT MALAYA ALOR SETAR
NG KEE WEI – Appellant
Versus
TENAGA NASIONAL BERHAD – Respondent
[Civil Appeal No: 12NCVC(B)-05-01/2017]



Important Points

The court affirmed that, under Section 38(4) of the Supply of Electricity Act, prima facie evidence shifts the burden to the defendant to prove otherwise in meter tampering cases.

Subject

Civil Law - Commercial Law

Act Referred

Supply of Electricity Act 1990: S.38(4)

Headnote

(A) Supply of Electricity Act 1990 – Section 38(4) – Appeal against finding of meter interference – The Sessions Court found meter tampering, necessitating backbilling to encompass loss of revenue – The appellant contended the absence of evidence for liability – Court upheld findings, emphasizing prima facie evidence under Section 38(4) and shift of burden to the appellant. (Paras 9, 10, 12, 16, 18)

Facts of the case:

The case arose from meter interference at appellant’s hotel as claimed by Tenaga Nasional Berhad; inspect findings corroborated alleged tampering.

Findings of Court:

There was legitimate evidence confirming meter interference and accountability for revenue loss.

Issues

: Primarily the determination of liability for meter tampering and the legitimacy of the quantum decided by the lower court.

Ratio Decidendi:

The court concluded that Tenaga need not demonstrate direct action by the appellant regarding tampering before being entitled to claim losses; further, the appellant did not disprove Tenaga's prima facie evidence regarding calculation of losses.

Result:

Appeal dismissed.

Petitioner Advocates:Francis Vivekanandah FP Nathar ,Respondent Advocate: Fathima Mohd Idris

JUDGMENT

Chan Jit Li J:

[1] This appeal emanates from the Sessions Court of Alor Setar. At the lower Court, the learned Sessions Judge had entered judgment in favour of the plaintiff, Tenaga Nasional Berhad (hereinafter referred to as 'Tenaga').

[2] The appellant was Tenaga's customer and the claim against him was premised on meter interference which Tenaga claimed caused it to suffer loss. The lower Court found (i) that there was interference with the meter and (ii) Tenaga was entitled to the amount of damages it sought. It is the appellant's contention that the learned Sessions Judge erred on her finding that there was meter interference and in allowing the quantum.

[3] At the appeal, there was no dispute that the appellant was Tenaga's customer and he ran a hotel business. The electricity was supplied to this hotel which is known as Sweet Star hotel.

[4]Tenaga's case is that on 6 November 2012 Tenaga's agent, SP1, had conducted an inspection at the premises and found that the meter had been interfered with. The interference had caused a lower reading of the electricity consumption.

[5] En Francis Vivekanandah a/l FP Nathar (hereinafter referred to as 'En Francis') submits there was no evidence to support the fact that there was interference of the meter. He also submitted that even if there was interference of the meter, the appellant should not be held liable as Tenaga had failed to show that it was the appellant who was responsible for the interference.

[6] The law on appellate interference in respect of a finding of fact by the trial Court is trite. The Federal Court in China Airlines Ltd v. Maltran Air Corp Sdn Bhd , speaking through Mohamed Dzaiddin Abdullah FCJ (as he then was) held (at p 169):

It is a settled principle of law that in an appeal, where facts have to be reviewed, it is undesirable that the findings of the Court below should be disturbed by a Court of appeal unless it appears that those findings are clearly wrong, and more especially that it is undesirable to do so where the conclusions reached must to a large extent depend on the credibility of the witnesses and the impression formed by a Court which has seen them and can Judge their honesty and accuracy (Crofter Harris Tweed Co v. Veitch) [1942] 1 All ER 142 HL per Lord Porter at p 167.

[7] The learned Sessions Judge's finding that there was an interference is a finding of fact which this Court should be slow in/ interfering. But that is not to say that I have not considered the grounds for her finding. After setting out the evidence of SP1 at para 4 of her grounds of judgment, the learned Sessions Judge went on to explain the basis of her findings as follows:

Isu-isu yang dibangkitkan dan alasan-alasan Mahkamah di dalam mencapai keputusan tersebut adalah seperti berikut:

a) Isu Pengusikan

Menurut SP1 terdapat usikan pada terminal pepasangan meter dan terdapat kejanggalan pada pepasangan meter bagi premis Defendan pada masa ianya diperiksa oleh SP1 dan pasukan pada 6 November 2012. Daripada ujian kejituan SP1 mengesahkan terdapat ralat dalam lingkungan sebanyak -22.55% pada bacaan meter yang menunjukkan meter tidak merekodkan beban sebenar yang digunakan di premis tersebut untuk akaun tersebut. Gambar P2(4) menunjukkan keadaan seal di terminal meter yang telah diusik. Pemeriksaan SP1 pada pendawaian di belakang papan meter juga mendapati wayar masukkan dan wayar keluaran ke terminal meter untuk fasa biru dan neutral diterbalikkan. Menurut SP1 ini tidak mengikut piawaian TNB dan mengakibatkan reverse voltage dan oleh itu meter tidak dapat merakamkan penggunaan bekalan elektrik yang sebenar ke premis tersebut. Gambar-gambar (P2(1-27)) menunjukkan pemeriksaan yang telah dijalankan oleh SP1 dan kejanggalan-kejanggalan yang telah direkodkan oleh beliau dan pasukan semasa pemeriksaan. Hasil pemeriksaan tersebut SP1 telah mengeluarkan borang pemeriksan meter (P1). Pemeriksaan SP1 ini telah dijalankan dalam kehadiran wakil Defendan dan menurut SP1 beliau telah menjelaska



1
2
3
4
5
6
7
8
9
10
11