2026 MarsdenLR 5833

IN THE HIGH COURT OF MALAYA AT KUALA LUMPUR
AZLAN SULAIMAN, J
ELITE PARK DEVELOPMENT SDN BHD – Plaintiff
Versus
ZULHKIPLE ABU BAKAR – Defendant
CIVIL SUIT NO: WA-22C-17-04/2023



Important Points

The court reaffirmed that adverse inferences may be drawn when critical evidence is withheld and that expert testimony must be rejected if the expert lacks practical industry experience or fails the test of independence and objectivity.

Subject

Civil Law - Construction Law

Act Referred

Evidence Act, 1950: S.45(1), S.114(g)
Rules of Court, 2012: O.59 R.16(1)

Headnote

(A) Evidence Act, 1950 - Section 114(g) - Adverse Inference - Where a party fails to produce material evidence or call key witnesses who are best positioned to justify a momentous commercial decision, the court may presume that such evidence would, if produced, be unfavourable to the person who withholds it. (Paras 81, 83, 87, 88)

(B) Evidence Act, 1950 - Section 45(1) - Expert Opinion - Expert evidence is admissible to provide the court with scientific information beyond common knowledge. However, such evidence may be rejected on grounds of an acute lack of practical industry experience, a lack of independence and objectivity (such as when the expert is funded by the party calling them), or when the expert acts as an advocate for the party rather than an independent assistant to the court. (Paras 125-128, 129-135, 138)

(C) Insurance Law - Material Damage - Burden of Proof - In claims for material damage, the burden lies on the claimant to prove that the loss and damage suffered was sudden and unforeseeable. A pre-planned demolition conducted without professional advice necessitating such action does not satisfy the requirement of sudden or unforeseen loss. (Paras 169-171, 174)

Facts of the case:
A developer discovered cracks in the transfer beams of a newly constructed residential block and a carpark. Having previously engaged a structural engineer for value engineering to optimize designs and reduce costs, the developer later alleged structural inadequacies and unilateral decision to demolish and reconstruct the buildings. The developer subsequently sued the structural engineer for design defects, the contractor for poor workmanship, and an insurer for rejecting a claim for demolition and reconstruction costs.

Findings of Court:
The court found that the engineering reports available at the time of the decision to demolish recommended strengthening and rectification, not demolition. The claim that the buildings were in a state of imminent collapse was contradicted by the documentary record and the developer's own conduct. The expert witness called during the trial was found to be biased due to financial ties to the developer and lacked the necessary practical experience in the construction industry. The decision to demolish was determined to be a commercial choice rather than a technical necessity.

Issues: Whether the structural cracks were caused by design defects and were sufficiently severe to warrant demolition rather than rectification; whether the contractor provided substandard materials or workmanship; and whether the insurance policy covered the losses resulting from the demolition.

Ratio Decidendi: The court ruled that the plaintiff failed to establish a technical necessity for demolition, as the professional advice received pointed toward rectification. An adverse inference was drawn against the plaintiff for failing to call the executive leadership and failing to produce reports from other appointed consultants. The expert testimony was rejected for lack of objectivity and practical expertise. Regarding the insurance claim, the loss was not sudden or unforeseen, and the claim was filed outside the contractual notification period.

Result: The Plaintiff's claims against all three Defendants are dismissed with costs; judgment is entered in favour of the 1st Defendant against the Plaintiff for the sum of RM114,088.23, with interest at the rate of 5% per annum from 23.5.2019 until realisation.

Legal Category Hierarchy

  • contract law
    • breach of contract
    • damages for breach
    • consultancy agreement
      • value engineering services
  • tort
    • negligence
      • professional negligence
  • insurance law
    • contractor's all risk policy
    • claim notification
    • exclusions
  • practice and procedure
    • evidence
      • adverse inference
      • expert evidence
      • burden of proof
    • costs

Advocates:
Counsel:
Mr. Sanjay Mohan
(Mr. K. Gobinath & Encik Sheikh Omar Bin Taha with him)
(Messrs. JR Tey)
For the Plaintiff
Mr. Sandosh Anandan
(Mr. Yashodhan Reddy Panniselvam & Clk Fatin Nadzirah Binti Hasan with him)
(Messrs. Sandosh Anandan)
For the 1 1st Defendant
Mr. Edwin Lim
(Ms. Cheryl Patricia Fredericks with him)
(Messrs. Edwin Lim & Suren)
For the 2nd Defendant
Mr. Wong Wai Leong
(Mr. Alvin Kua with him)
(Messrs. Azim, Tunku Farik & Wong)
For the 3rd Defendant
Legislation:
Evidence Act, 1950, Sections 45(1) and 114(g)
Rules of Court, 2012, Order 59 rule 16(1)

GROUNDS OF JUDGMENT

Introduction

1. When cracks appeared in a few transfer beams in the newly constructed ten-storey block of apartments ("Block A") and in thetwo-storey carpark ("Carpark") of a development project in Bandar Kundang, Rawang, Selangor ("Project"), the Plaintiff, a member of the property development group known as "Mah Sing", engaged another structural engineer to examine them and report the next step forward. Despite that structural engineer reporting and recommending repair and rectification works to both Block A and the Carpark, the Plaintiff unilaterally decided to wholly demolish both.

2. By this action, the Plaintiff is claiming damages of over RM40m from the structural engineer for the Project, the contractor who constructed Block A and the Carpark, and the insurance company who rejected its claim, being the alleged demolition and reconstruction costs as well as other associated losses.

3. Were the cracks caused by the 1st Defendant's design? Were the cracks of a nature and extent leaving the Plaintiff no other option except demolition of Block A and the Carpark and re-construction of it anew as opposed to repair and rectification? Are the Defendants liable for the damages that the Plaintiff claims? These are just some of the questions that this Judgment will endeavour to answer.

Salient facts leading up to demolition and reconstruction of Block A and the Carpark and

4. The Project involved the construction of Block A and another Block B, altogether housing 488 apartment units, together with, inter alia, the Carpark. Majlis Perbandaran Selayang ("MPS") had issued approval for that development in March 2014. Up to the time thisaction was filed, only Block A and the Carpark had been constructed. This action is not concerned with Block B.

5. By a Letter of Award dated 28.11.2014 ("LOA-D2"), the Plaintiff had appointed the 2nd Defendant as the main contractor for the Project at the contract sum of RM54m and subject to the terms and conditions of LOA-D2 and the contract document (collectively "Construction Contract").

6. By a letter dated 15.1.2015, the 2nd Defendant submitted to the Plaintiff, inter alia, Contractor's All Risk Policy NO: w/14/EC00/027162/KUL-97 dated 12.12.2014 ("Insurance Policy") that was issued by the 3rd Defendant, that would eventually be the basis of the Plaintiff's claim against the 3rd Defendant. The 2nd Defendant submitted it to the Plaintiff via Atelier ADT Akitek (Asia) Sdn Bhd ("Architect"), the appointed architect for the Project.

7. Initially, the Plaintiff had appointed Advanced Consulting Engineers Sdn Bhd ("ACE") as the Civil & Structural Engineer for the Project. However, in due time, ACE was replaced by the 1st Defendant.

8. Even though the 1st Defendant's core competency is in civil and structural engineering, for many years prior to the Project he has offered valued engineering services as his speciality. In providing such services to this Project, in layman terms he essentially examined the existing civil and structural design and drawings for a construction project prepared by ACE and approved by Majlis Perbandaran Selayang ("MPS") in March 2014, and then proposedways to the Plaintiff to refine that design for the main purpose of saving time and costs but without compromising the safety and reliability of the design for the Project.

9. The date that the 1st Defendant first became involved in the Project is unclear, as neither the Plaintiff nor the 1st Defendant adduced at the trial any document attesting to that. However, a letter dated 28.1.2015 issued by MQS Consult ("MQS"), the Quantity Surveyor for the Project, refers to a Supplementary Agreement for Replacement of Structural Engineer under Article 4 of the PAM Contract, by which the 1st Defendant was to replace ACE. Thus, it is safe to assume that, by 28.1.2015, the 1st Defendant was involved in the Project in some capacity.

10. In fact, by a letter dated 28.1.2015, the 2nd Defendant submitted the Concrete Mix Design for Grade

OCR图片

OCR图片

1
2
3
4
5
6
7
8
9
10
11