High Court of Malaya Dismisses RM40 Million Claim by Elite Park Development Over Unjustified Demolition

In a significant ruling that underscores the boundaries of professional liability in construction projects, the High Court of Malaya at Kuala Lumpur dismissed a RM40,670,557.81 lawsuit brought by property developer Elite Park Development Sdn Bhd against its structural engineer, contractor, and insurer. The court found that the developer’s decision to demolish and rebuild a newly constructed apartment block and carpark was a commercial choice, not a technical necessity, and that the plaintiff had failed to prove any actionable breach of duty.

A Costly Decision: When Cracks Led to Demolition

The dispute arose from a project in Bandar Kundang, Rawang, where Elite Park Development (part of the Mah Sing group) constructed a ten-storey apartment block (Block A) and a two-storey carpark. In late 2017, minor cracks appeared on transfer beams. By May 2018, the cracks had propagated, prompting the developer to appoint structural engineer Ir. Dr. Wong Fook Keong to investigate. Dr. Wong’s report, submitted in September 2018, recommended strengthening works—not demolition. Nevertheless, in early 2019, Elite Park Development decided to entirely demolish both structures and rebuild them from scratch, at a cost of over RM34 million. It then sued the 1st Defendant (structural engineer Zulhkiple Abu Bakar), the 2nd Defendant (the main contractor), and the 3rd Defendant (the insurer) for the full demolition and reconstruction costs plus associated losses.

The Engineer’s Defence: Cracks Within Limits

The 1st Defendant, a civil and structural engineer engaged to provide value engineering services, consistently maintained that his design was sound and that the cracks—measured at under 0.3mm—fell within the allowable tolerance of British Standard BS8110:1997. He pointed to tell-tale glass monitors that remained intact for ten months, demonstrating that the cracks were non-propagating and the structure stable. The 1st Defendant also noted that the developer rejected his offer to discuss the matter and refused a joint site inspection. In a letter to the Board of Engineers Malaysia, he certified the building as safe for occupancy, a statement the plaintiff never rebutted.

Expert Witnesses Under Fire

The court delivered a scathing critique of the plaintiff’s expert evidence. Justice Azlan Sulaiman found that Ir. Dr. Wong, the plaintiff’s key witness, had contradicted his own report at trial by claiming the buildings were in a state of “imminent collapse”—a phrase that appeared nowhere in his written report and was not pleaded. The judge observed that Dr. Wong’s about-turn likely stemmed from his subsequent appointment as the engineer for the reconstruction, making his testimony self-serving. “Ir. Wong was not a truthful witness,” the court declared, rejecting his oral evidence.

Even more damaging was the court’s assessment of Dr. Farzad Hejazi, the plaintiff’s forensic expert. Dr. Farzad was appointed months after the lawsuit was filed and after 90% of Block A had already been demolished. His report, based on samples from debris, suffered from chain-of-custody issues and questionable methodology. Crucially, the court noted that Dr. Farzad’s curriculum vitae listed him as a “Project Manager for Mah Sing” from 2019 to 2023 and disclosed an industry grant from Mah Sing to fund his study—conflicts of interest he failed to reveal. “He can hardly be expected to provide an independent, bias-free and objective analysis,” the judge wrote.

A Commercial Choice, Not a Technical Necessity

The central question was whether the cracks were of such severity that demolition was the only viable option. The court found that the plaintiff had not produced any professional advice recommending demolition. To the contrary, all contemporaneous reports—including those from Ir. Wong, OSD Consultants, and the 1st Defendant—pointed to strengthening or repair. The developer’s own CEO, Datuk Ho Hon Sang, who signed the demolition notification, was not called to testify, leading the court to invoke an adverse inference under Section 114(g) of the Evidence Act. “The Plaintiff’s decision to demolish and reconstruct Block A and the Carpark was in reality a commercial decision, and not one primarily motivated by true or genuine safety concerns,” the judgment read.

The Verdict: Claims Dismissed, Engineer Awarded Fees

The court dismissed all claims against the three defendants, ordering Elite Park Development to pay costs: RM670,000 to the 1st Defendant (including for his counterclaim), RM500,000 to the 2nd Defendant, and RM500,000 to the 3rd Defendant. Additionally, the 1st Defendant was awarded RM114,088.23 in outstanding fees under the Consultancy Agreement, with interest at 5% per annum from 23 May 2019. The ruling serves as a stark reminder that developers cannot unilaterally demolish structures and then seek to pass the costs onto their consultants and contractors without clear, independent evidence that such extreme measures are technically justified.