RANJAN GOGOI, M.Y.EQBAL
NORTH EASTERN RAILWAY – Appellant
Versus
TRIPPLE ENGINEERING WORKS – Respondent
Judgment
Ranjan Gogoi, J.
1. The challenge in this appeal is to order dated 27.06.2012 of the Patna High Court by which a former Chief Justice of the Sikkim High Court had been appointed as the arbitrator to resolve the disputes and differences between the parties to the present proceedings arising out of two contracts bearing No. CAO/CON/722 dated 01.11.1993 and CAO/CON/738 dated 28.04.1994.
2. Both the contracts awarded to the respondent-contractor were terminated on 7.11.1994. Admittedly, the General Conditions of Contract of the Railways, which included an arbitration clause, governed the parties. After the termination of the two contracts the respondent-contractor approached the Patna High Court by means of a writ petition challenging the terminations. The writ petition was dismissed, which dismissal was challenged before this Court in SLP(C) No. 17189/1995. The said special leave petition was also dismissed leaving parties to resolve the differences in an appropriate proceeding i.e. a civil suit or by reference to arbitration, as the case may be.
3. Though a panel of arbitrators as per Clauses 64(3)(a)(ii) and (iii) of the General Conditions of Contract was appointed as far back
Ace Pipeline Contracts (P) Ltd. Vs. Bharat Petroleum Corporation Ltd.
Union of India Vs. Bharat Battery Manufacturing Co. (P) Ltd., (2007) 7 SCC 684
Punj Lloyd Ltd. Vs. Petronet MHB Ltd.
Indian Oil Corporation Limited and Others Vs. Raja Transport Private Limited
Union of India Vs. Singh Builders Syndicate
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.