NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION, NEW DELHI
Ram Surat Ram Maurya, Presiding Member
National Aluminium Company Ltd. —Complainant
versus
M/s. Reliance General Insurance Company Ltd. and Anr. —Opp. Parties
Consumer Case No.50 of 2008
Decided on 4.1.2022

Subject

Insurance Dispute - Fire and Lightning Claim

Act Referred

CONSUMER PROTECTION ACT : S.21(a)(i), S.58(1)(a)(i)

Headnote

Consumer Protection Act, 1986 – Section 21(a)(i)[Consumer Protection Act, 2019 – Section 58(1)(a)(i)] – Services – Insurance – Repudiation of Claim – Complaint has been filed alleging repudiation of claim ground that fire was caused due to power frequency over voltage/ switching transient over voltage – Whether repudiation can be termed as proper, if Complainant is entitled for reimbursement – Fire and lightening insured perils – If there had been voltage fluctuation from 960 MW Captive Power Plant, then other rectifier connected with it might have also been affected. In such circumstances, the cause of fire as mentioned in the reports of the Surveyors and in repudiation letter is not liable to be accepted. The view taken by the team of experts that the fire was caused due to lightning, is liable to be accepted. Fire & Lightning are insured perils. In view of the aforesaid discussions, it is held that the cause of fire was lightning, which was an insured peril and General Exception clause-7, is not attracted. Repudiation of the claim was illegal – complaint is partly allowed. The Insurer is directed to reimburse the claim of the Insured for Rs. 12425905/- along with interest @ 10% per annum. [Para 12]

Held: The Surveyor has drawn adverse inference for the reason that departmental inquiry report has not been supplied to him. In fact, there was no departmental inquiry, rather; the Insured deputed AREVA T & D, France, the manufacturer company, for inspection of the damaged rectifier. [Para 11].

Result: Appeal is allowed.

Advocates:
Counsel for the Parties:
For the Complainant:Mr. Ashok Kumar Gupta, Sr. Advocate, Mr. Kapil Raghav, Advocate and Mr. K.K. Satapathy, DGM (Material), NALCO
For the Opp. Parties:Mr. P.K. Seth, Advocate

ORDER

Ram Surat Ram Maurya, Presiding Member.—Heard Mr. Ashok Kumar Gupta, Sr. Advocate, assisted by Mr. Kapil Raghav, Advocate, for the complainant and Mr. P.K. Seth, Advocate, for the opposite party.

2. National Aluminium Company Limited (the Insured) has filed this complaint for directing M/s. Reliance General Insurance Company Ltd. (the Insurer) to pay (i) Rs.66952229/- with interest @24% per annum w.e.f. 15.07.2006 till its realization, under Policy No. 15-21-11-00741-06 (ii) cost of litigation and (iii) any other relief which may deemed fit and proper in the circumstances of the case.

3. The facts, as stated in the complaint and emerged from the documents attached with the complaint, are as follows:-

(a) National Aluminium Company Limited (the Insured) was incorporated in the year 1981, as a public sector enterprise of Government of India, under Ministry of Mines. It has its mining and alumina refining facilities in district Koraput, Orissa and also established an aluminium smelting, casting and power generation unit, in district Angul, Orissa, commissioned during 1985-87. It is Asia’s largest integrated aluminium complex. National Aluminium Company Limited has emerged to be a star performer in production and export of alumina and aluminium and more significantly in propelling a self-sustained growth. Due to its sterling performance, it has bagged various awards.

(b) Aluminium Smelter Plant, Angul has production capacity of 345000 tonnes per year. In aluminium smelting process, huge electricity is required. National Aluminium Company Limited established a 960 MW Captive Power Plant, at Angul, for the supply of electricity to Aluminium Smelter Plant. From Captive Power Plant, 220 KV, AC current is supplied to smelter sub-station, where it is converted into DC current, by means of high current capacity rectifier banks. DC current is fed from smelter sub-station to Potlines (series of pots), where the aluminium is produced by electrolyses. There are three Potlines, each of production capacity of 115000 tones per year. Each Poline is fed DC current by means of four rectifier groups. Each rectifier is associated with relevant equipment, like transformers, DC switches, rectifier bank, circuit breakers etc. There are 24 rectifier groups in the sub-station.

(c) M/s. Reliance General Insurance Company Ltd. (for short the Insurer) is an insurance company, engaged in the business of providing insurance services of different nature. The Insured, vide NIT dated 17.03.2006, invited tenders for Standard Fire and Special Peril Policy, of the smelter plant, for a period of one year. The Insured accepted tender of the Insurer and paid Rs.20799691/- towards premium of the insurance, through cheque dated 28.04.2006, which was accepted on 01.05.2006 and the Insurer issued Standard Fire and Special Peril Policy i.e. Policy No.15-21-11-00741-06, for the period of 01.05.2006 to 30.04.2007, sum insured of Rs.19880660000/-, covering risk of Building, Plant & Machineries, a list of different machineries and its sum assured is attached with the policy. As per list, 220 KV sub-stations complete was insured for Rs.717370000/-. After charging extra premium of Rs.186847/- on 09.05.2006, Sum Insured was increased to Rs20063253000/-, vide Endorsement No.55-001-06.

(d) On 20.05.2006 at 20:00 hours, heavy rainfall accompanied with lightning lashed started in the area of the smelter plant. At 20:20 hours, Potline-2, Group-3, tripped on ‘RC protection operated’ and other three groups of Potline-2 tripped on ‘DC overload’ along with heavy sound of explosion. This resulted in interruption of DC current to Potline-2. The shift persons, manning the sub-station went to the site and found that fire and smokes were coming out of the rectifier room of group-3, R-2 side. The building of rectifier was also damaged. The shift people immediately disconnected the power supply from source and reported the incident of fire to CISF Fire wing, who came on the spot im