2013 Supreme(Ker) 1128
IN THE HIGH COURT OF KERALA AT ERNAKULAM
S.S. Satheesachandran, J.
KERALA STATE ELECTRICITY BOARD AND ANOTHER – Appellants
Versus
PAUL AND ANOTHER – Respondents
O.P. (C) No. 978 of 2012
Decided On : 21-02-2013
Important Points
Subject
Civil Law - Injunctions and Orders
Act Referred
Headnote
Injunction - Violation of Order - Code of Civil Procedure - Order XXXIX, Rule 2A
Fact of the Case:
The plaintiffs sought an interim mandatory injunction to restore the status quo ante over a road. The defendants, including a statutory authority and its officers, resisted the petitions, claiming the road belonged to the 1st defendant and that the suit was filed to annex more portions from their property.
Finding of the Court:
The court found that the lower courts had ignored fundamental principles applicable to prosecuting a person for violating an order of injunction. It held that the defendants should have been given a reasonable opportunity to defend themselves and that there must be clear proof of disobedience of the injunction to punish them.
Issues: The main issue was the violation of the order of injunction and the procedural requirements to be followed in prosecuting and punishing a person as a condemner.
Ratio Decidendi: The court emphasized the need for clear proof of disobedience of the injunction and the requirement to afford the defendants a reasonable opportunity to defend themselves.
Final Decision: The court annulled the orders for punishment entered against the 2nd defendant and directed that the application for prosecuting the defendants should be considered with the suit after giving both sides an opportunity to lead evidence.
Advocate Appeared:
For the Appellant : T.R. Rajan.
For the Respondents: K.P. Satheesan, Anoop V. Nair.
JUDGMENT :
S.S. Satheesachandran, J.
1. Petitioners are defendants 1 and 2 in a suit for injunction. Respondents are the plaintiffs. The above defendants have filed this original petition challenging Ext.P-12 common judgment passed by the learned District Judge in two appeals, by which, he affirmed Ext.P-11 common order passed by the Munsiff allowing two applications of plaintiffs, one for interim mandatory injunction and the other for prosecution of defendants for violation of the interim injunction ordered against them in the suit. Ext.P-1 is copy of the plaint which describes two schedules ‘A’ schedule and ‘B’ schedule. The former is stated to be a property in possession of the plaintiffs and the latter a road having a width of four meters allegedly used for ingress and egress to ‘A’ schedule and also to a Church. Plaintiffs laid the suit alleging that attempts are being made by defendants to interfere with their enjoyment over ‘B’ schedule putting up concrete posts in that road. An ex-parte order of interim injunction applied by plaintiffs was granted in their favour restraining the defendants from doing any act causing obstruction to the enjoyment of that road by plaintiffs. An advocate commissioner appointed by the court after conducting local inspection filed Ext.P-5 report. That was an ex-parte commission. After passing of the order of interim injunction, violating that order defendants dug some ditches and also put up concrete posts in ‘B’ schedule road, was the case of plaintiffs to file two applications, one for prosecution of the defendants and the other for an interim mandatory injunction to restore the status quo ante over ‘B’ schedule road. Ext.P-6 is the application moved under Order XXXIX, Rule 2A of the Code of Civil Procedure, for short, the ‘Code’ to prosecute the defendants, and Ext.P-7, the application for interim mandatory injunction. The defendants, the first among whom is a statutory authority, and the other two, its officers, resisted the petitions contending that the road described as ‘B’ schedule belong to the 1st defendant, and, whatever acts done were within the adjoining property belonging to the 1st defendant, but close to ‘B’ schedule, and that too in the presence of police officials, whose assistance had been secured to do such acts. Plaintiffs after removing some concrete posts from the property of defendants filed the suit suppressing material facts and their intention is to carve out a motorable way annexing more portions from property of defendants, according to them. They had only replaced the dismantled posts at the spot where such posts existed earlier, which had been removed by plaintiffs committing mischief, was the case of defendants resisting the applications for interim mandatory injunction and also their prosecution alleging violation of injunction order.
2. Advocate Commissioner, who had conducted local inspection earlier and filed Ext.P-5 report, was deputed by the court again, and, he filed Ext.P-10 report. The report disclosed that after his first inspection, some ditches had been dug and also concrete posts were put up in ‘B’ schedule road. Learned Munsiff, after considering Exts.P-6 and P-7 petitions, with reference to the objections filed, and also materials placed, passed Ext.P-11 common order directing the defendants to restore ‘B’ schedule road to its previous condition removing the concrete posts and filling up the ditches within a period of one month, and in default of compliance, plaintiffs were allowed to restore that road to its original position with further order, in that event, for detention of Executive Engineer, who filed objections to the petitions, for one month and for attachment of his property. Appeals preferred by defendants against Ext.P-11 order was dismissed by the learned District Judge, who affirmed such order, but, granted one more month’s time to comply with the directions given by lower court. In default of compliance, under Ext.P-12 common judgment,